TALCHER

Location:

Odisha

Quantity:

4 MTPA

Address:

The oldest washery of GCMPL got commissioned in 2003, at Talcher (odisha). Current standing order is with the Andhra Pradesh Power Generation Corporation (APGENCO) for a quantity of 3.3 MTPA of raw coal. Washing technology used here is Dense/Heavy Media, Pneumatic Jig, HM Cyclone, Classify Cyclone